Agenda Item
Meeting Date:
7/19/2023 - 6:00 PM  
Category:
SCHOOL FACILITIES MANAGEMENT  
Type:
Action  
Subject:
16.15 Change Order 1 10927 Paideia School 15 “HVAC Upgrades” General Construction to Mengler Mechanical, Inc. for $31,237.00  
District Goals:
 
Enclosure:
 
File Attachment:
Change Order Log MENGLER - GC 05-24-2023.pdf
BOCS CO 1 MENGLER MECHANICAL - GC.xlsx
Award Mengler GC Contract 1 06-14-2022 Res 20.12.pdf
 
Rationale:
By Resolution 20.12 dated June 14, 2022, the Trustees of the Board of Education authorized the award of General Construction Contract 2022-0925 for CIP 10927 “HVAC Upgrades” at Paideia School 15 to Mengler Mechanical, Inc. for $204,000.00 and a term of 365 calendar days.

This is to authorize the Change Order GC-1 in the amount of $31,237.00, increasing the contract from $204,000.00 to $235,237.00, and the term to 730 calendar days.

This change order is for field conditions and owner directed additional work performed at negotiated lump sum prices.

Seven change order proposals (3 for additional work and 4 were credits) were requested of the contractor by the District for additional work, most of which was due to changed, deteriorated or unforeseen conditions. This includes but is not limited to the additional roofing work required, additional steel post and beams required to raise all six units higher off the roof and first floor ceiling repairs.
 
Funding:
B5515CP110927.B18C01.B2200A1620 $31,237.00 LCBF  
Resolution
Ladies and Gentlemen:

WHEREAS: By Resolution 20.12 dated June 14, 2022, the Trustees of the Board of Education authorized the award of General Construction Contract 2022-0925 for CIP 10927 “HVAC Upgrades” at Paideia School 15 to Mengler Mechanical, Inc. for $204,000.00 and a term of 365 calendar days, and

WHEREAS: This change order is for field conditions and owner directed additional work performed at a negotiated lump sum price of $31,237.00, and

WHEREAS: Seven change order proposals (3 for additional work and 4 were credits) were requested of the contractor by the District for additional work, most of which was due to changed, deteriorated or unforeseen conditions, and

WHEREAS: This includes but is not limited to the additional roofing work required, additional steel post and beams required to raise all six units higher off the roof and first floor ceiling repairs.

NOW THEREFORE BE IT RESOLVED: That the Superintendent of Schools is hereby authorized to issue Change Order 1 to General Construction Contract 2022-0925, “HVAC Upgrades” at Paideia School 15 to Mengler Mechanical, Inc., 1689 Route 22, Brewster, NY 10509 for $31,237.00, increasing the contract from $204,000.00 to $235,237.00 and the term to 730 calendar days.
 
Approvals:
Recommended By:
Signed By:
Michael Pelliccio - Director of Facilities III
Signed By:  
Tom Collich - Purchasing Director
Signed By:  
Finance Department - Finance Reviewer
Signed By:  
Elizabeth Janocha - Deputy Commissioner
Signed By:  
John Liszewski - Commissioner
Signed By:  
Matthew Gallagher - Corporation Counsel
Signed By:  
Dr. Edwin M. Quezada - Superintendent of Schools
 
Vote Results:

Original Motion
Member Kevin Cacace Moved, Member Dr. John Castanaro seconded to approve the Original motion 'Ladies and Gentlemen:

WHEREAS: By Resolution 20.12 dated June 14, 2022, the Trustees of the Board of Education authorized the award of General Construction Contract 2022-0925 for CIP 10927 “HVAC Upgrades” at Paideia School 15 to Mengler Mechanical, Inc. for $204,000.00 and a term of 365 calendar days, and

WHEREAS: This change order is for field conditions and owner directed additional work performed at a negotiated lump sum price of $31,237.00, and

WHEREAS: Seven change order proposals (3 for additional work and 4 were credits) were requested of the contractor by the District for additional work, most of which was due to changed, deteriorated or unforeseen conditions, and

WHEREAS: This includes but is not limited to the additional roofing work required, additional steel post and beams required to raise all six units higher off the roof and first floor ceiling repairs.

NOW THEREFORE BE IT RESOLVED: That the Superintendent of Schools is hereby authorized to issue Change Order 1 to General Construction Contract 2022-0925, “HVAC Upgrades” at Paideia School 15 to Mengler Mechanical, Inc., 1689 Route 22, Brewster, NY 10509 for $31,237.00, increasing the contract from $204,000.00 to $235,237.00 and the term to 730 calendar days.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 6 Nay: 0 Abstain: 1.
The motion Carried 6 - 0
   
Rev. Steve Lopez     Yes
Kevin Cacace     Yes
Gail Burns     Abstain
Dr. John Castanaro     Yes
Sheila Greenwald     Yes
Rosemarie Linton     Yes
Lawrence Sykes     Yes