SCHOOL FACILITIES MANAGEMENT |
|
|
Type:
|
|
Subject:
|
17.33 AWARD CIP 10882 School 14 GC, Grace Contracting $834,000.00 |
|
|
District Goals:
|
|
Enclosure:
|
|
File Attachment:
|
|
Rationale:
|
Construction contract IFB 6602, General Construction Contract work, “Cafeteria & 3rd Floor Emergency Egress Improvements”, in compliance with General Municipal Law 103, was let for public bid and bids were opened in public and read aloud on April 23, 2021. A total of three (3) bids were received, with the highest bidder at $969,000.00 the average at $901,050. The work was designed by Fuller & D’Angelo Architects and was estimated to be approximately $750,000.00 Scope of work includes but is not limited to the replacement of sections of the 3rd floor Fire Escape and installation of a new fire exit from the Gym providing proper ADA access. Replacement of existing steam heat radiation in the Gym, masonry repointing in select areas and select new site fencing. |
|
|
Funding:
|
B5514CP110882.B21C01.B2200A1620 $834,000.00 Local Capital Bonded Fund |
|
|
Resolution
|
Ladies and Gentlemen: WHEREAS: in compliance with General Municipal Law 103 public bids opened on April 23, 2021 for RFB 6602 Contract 1 for General Construction Work, “Cafeteria & 3rd Floor Emergency Egress Improvements “and WHEREAS: three (3) bids were received and read aloud in public, and WHEREAS: such bids were duly examined and as a result, the administration has determined that Grace Contracting & Development is the lowest responsive and responsible bidder at $ 834,000.00 NOW THEREFORE BE IT RESOLVED: that contract IFB 6602, Contract 1 General Construction work, “Cafeteria & 3rd Floor Emergency Egress Improvements”,” at School 14, to Grace Contracting & Development 427 Beach Road, Haverstraw, NY 10993 for $834,000.00 for a term of 365 calendar days. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
John Carr - Executive Director |
|
Signed By: |
|
Tom Collich - Purchasing Director |
|
Signed By: |
|
Finance Department - Finance Reviewer |
|
Signed By: |
|
Elizabeth Janocha - Deputy Commissioner |
|
Signed By: |
|
John Liszewski - Commissioner |
|
Signed By: |
|
Matthew Gallagher - Corporation Counsel |
|
Signed By: |
|
Dr. Edwin M. Quezada - Superintendent of Schools |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Kevin Cacace Moved, Member Abdool H. Jamal seconded to approve the Original motion 'Ladies and Gentlemen: WHEREAS: in compliance with General Municipal Law 103 public bids opened on April 23, 2021 for RFB 6602 Contract 1 for General Construction Work, “Cafeteria & 3rd Floor Emergency Egress Improvements “and WHEREAS: three (3) bids were received and read aloud in public, and WHEREAS: such bids were duly examined and as a result, the administration has determined that Grace Contracting & Development is the lowest responsive and responsible bidder at $ 834,000.00 NOW THEREFORE BE IT RESOLVED: that contract IFB 6602, Contract 1 General Construction work, “Cafeteria & 3rd Floor Emergency Egress Improvements”,” at School 14, to Grace Contracting & Development 427 Beach Road, Haverstraw, NY 10993 for $834,000.00 for a term of 365 calendar days.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 8 Nay: 0. | The motion Carried 8 - 0 | | | Sheila Greenwald | Yes | Gail Burns | Yes | Lakisha Collins-Bellamy | Yes | Dr. John Castanaro | Yes | Abdool H. Jamal | Yes | Dr. Rosalba Corrado Del Vecchio | Yes | Rev. Steve Lopez | Yes | Kevin Cacace | Yes | |
|
|
|
|
|
|