15.7 Award CIP 10878 Plumbing Work on “Heat Plant, HVAC Upgrades & Asbestos Abatement” at Westchester Hills School 29 to Joe Lombardo Plumbing & Heating of Rockland, Inc. for $166,000.00  
District Goals:
 
Enclosure:
 
File Attachment:
BOCS 10878 PS29 PL.xlsx
AE Recommendation Letter Plumbing Lombardo.pdf
CM Recommendation Letter Plumb Lombardo.pdf
IFB 6889 Low Bidder's Bid Sheet Plumbing Lombardo.pdf
IFB 6889 Summary of Bids Plumbing.pdf
 
Rationale:
This is to award IFB-6889, Contract 3 of 4, Plumbing Work on CIP 10878 “Heat Plant, HVAC Upgrades & Asbestos Abatement” Part 2 at Westchester Hills School 29 to Joe Lombardo Plumbing & Heating of Rockland, Inc. for $166,000.00 and a term of 365 calendar days.

In compliance with General Municipal Law 103, bids were let and opened in public January 6, 2023. Three (3) bids were received, examined and all due diligence observed in determining that Joe Lombardo Plumbing & Heating of Rockland, Inc. is the lowest responsive and responsible bidder. The work was designed by Fuller & D’Angelo Architects who estimated the value of the work at $220,000.00. The highest bid was $291,000.00.

Overall, CIP 10878 has been separated into three Parts and includes parking expansion; new exterior doors, exterior lighting, heat plant & controls, windows, signage, flooring, ceilings & lights; ADA toilet room upgrades, high-tech security and emergency generator.

Part 1 substantially completed in 2022 includes new: exterior doors, hi-tech security, parking lots, generator, toilet room & PA upgrades and requisite asbestos work.

Part 2 being awarded here for 2023 construction, includes full heating plant replacement, HVAC and classroom upgrades.

Part 3 targeted for 2024 construction will include new windows, emergency generator and select ceilings and lights.
 
Funding:
B5529CP110878.B23C03.B2204A1620 $166,000.00 LCBF  
Resolution
Ladies and Gentlemen:

WHEREAS: IFB-6889 was publicly advertised and opened on January 6, 2023 in compliance with General Municipal Law 103 for Contract 3 of 4, Plumbing Work on CIP 10878 “Heat Plant, HVAC Upgrades & Asbestos Abatement” Part 2 at Westchester Hills School 29, and

WHEREAS: Three (3) such bids were received and duly examined and the administration has determined that, Joe Lombardo Plumbing & Heating of Rockland, Inc., the lowest responsive and responsible bidder with a bid of $166,000.00.

NOW THEREFORE BE IT RESOLVED: That the Superintendent of Schools is authorized to award a contract for IFB-6889, Contract 3 of 4, Plumbing Construction Work on CIP 10878 “Heat Plant, HVAC Upgrades & Asbestos Abatement” Part 2 at Westchester Hills School 29 to Joe Lombardo Plumbing and Heating of Rockland, Inc., 321 Spook Rock Road, Suffern, NY 10901 in amount not to exceed $166,000.00 for a term of 365 calendar days.
 
Approvals:
Recommended By:
Signed By:
Michael Pelliccio - Assistant Director of Facilities
Signed By:  
Tom Collich - Purchasing Director
Signed By:  
Finance Department - Finance Reviewer
Signed By:  
Elizabeth Janocha - Deputy Commissioner
Signed By:  
John Liszewski - Commissioner
Signed By:  
Matthew Gallagher - Corporation Counsel
Signed By:  
Dr. Edwin M. Quezada - Superintendent of Schools
 
Vote Results:

Original Motion
Member Kevin Cacace Moved, Member Gail Burns seconded to approve the Original motion 'Ladies and Gentlemen:

WHEREAS: IFB-6889 was publicly advertised and opened on January 6, 2023 in compliance with General Municipal Law 103 for Contract 3 of 4, Plumbing Work on CIP 10878 “Heat Plant, HVAC Upgrades & Asbestos Abatement” Part 2 at Westchester Hills School 29, and

WHEREAS: Three (3) such bids were received and duly examined and the administration has determined that, Joe Lombardo Plumbing & Heating of Rockland, Inc., the lowest responsive and responsible bidder with a bid of $166,000.00.

NOW THEREFORE BE IT RESOLVED: That the Superintendent of Schools is authorized to award a contract for IFB-6889, Contract 3 of 4, Plumbing Construction Work on CIP 10878 “Heat Plant, HVAC Upgrades & Asbestos Abatement” Part 2 at Westchester Hills School 29 to Joe Lombardo Plumbing and Heating of Rockland, Inc., 321 Spook Rock Road, Suffern, NY 10901 in amount not to exceed $166,000.00 for a term of 365 calendar days.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 8 Nay: 0.
The motion Carried 8 - 0
   
Rev. Steve Lopez     Yes
Kevin Cacace     Yes
Dr. Rosalba Corrado Del Vecchio     Yes
Dr. John Castanaro     Yes
Gail Burns     Yes
Sheila Greenwald     Yes
Rosemarie Linton     Yes
Lawrence Sykes     Yes