Review Agenda Item
Meeting Date: 9/21/2022 - 5:30 PM
Category: SCHOOL FACILITIES MANAGEMENT
Type: Action
Subject: 15.6 Assign 10952 School 16 Emergency Drain Restoration Design to Fuller & D'Angelo Architects for $9,300.00
District Goals:
Enclosure
File Attachment:
RES 15.3 3 16 2022.pdf
Res 15.15 2 26 2020.pdf
EMDEC - School 16 Classroom Flooding.pdf
F&D Proposal.pdf
Rationale: Via Resolution 15.3 dated March 16, 2022, the Board of Trustees authorized the extension of Contract 2020-0628 for Architectural and Engineering Services to Fuller and D’Angelo Architects by 365 calendar days to 3 years and increased the upset contract amount to $2 million.

An emergency declaration for “School 16 Flooding” was issued by the Superintendent on August 11, 2022 to replace failed structures that have caused flooding to rooms 10 and 12. All work is complete.

This is to assign the architectural design and permitting for CIP 10952 “Emergency Flood Remediation Work” at School 16 to Fuller & D’Angelo Architects for $9,300 and a term of 365 calendar days under contract 2020-0628.

Fuller & D’Angelo is to conduct surveys, review existing conditions and develop designs for SED permit and construction documents.

Scope of work is to include but is not necessarily limited to removal and replacement of existing stairs and drainage basins in areaway exit from classrooms 12 and 14, replacement of concrete slab and drainage basin at areaway from classroom 10, installation of new catch basin in parking area, new asphalt to facilitate for proper grading and drainage to new basin, and removal and replacement of interior corridor slab at basement corridor to replace damage under slab piping. The construction is estimated at $120,000.00.
Funding: B5516CP110952.B22C02.B2046A1620 $9,300.00 LCBF
Resolution: Ladies and Gentlemen:

WHEREAS: By Resolution 15.15 dated February 26, 2020, the Board of Trustees authorized the award of Contract 2020-0628 for Architectural and Engineering Services to Fuller & D’Angelo Architects for $1 million and a term of three years, and

WHEREAS: By Resolution 15.3 dated March 16, 2022 the Board of Education authorized amendment to increase contract amount to $2 million and the term to four years, and

WHEREAS: Work as described in contract 2020-0628 is required of Fuller and D’Angelo Architects in response to the issuance of the Emergency Declaration for “School 16 Flooding” dated August 11, 2022, and

WHEREAS: The response by Fuller & D’Angelo P.C., (F&D) was deemed most advantageous to the District at a cost not to exceed $9,300.00.

NOW THEREFORE BE IT RESOLVED: That the Superintendent of Schools is hereby authorized to assign the architectural work for CIP 10952, “Emergency Flood Remediation” at School 16 to Fuller and D’Angelo P.C. Architects and Planners, Road 45 Knollwood Road, Elmsford, New York 10523 for $9,300 for a term of 365 calendar days.
Approvals:
Recommended By:
Signed By:
John Carr - Executive Director
Signed By:
Tom Collich - Purchasing Director
Signed By:
Finance Department - Finance Reviewer
Signed By:
Elizabeth Janocha - Deputy Commissioner
Signed By:
John Liszewski - Commissioner
Signed By:
Matthew Gallagher - Corporation Counsel
Signed By:
Dr. Edwin M. Quezada - Superintendent of Schools
Vote Results:

Original Motion
Member Sheila Greenwald Moved, Member Amjed Kuri seconded to approve the Original motion 'Ladies and Gentlemen:

WHEREAS: By Resolution 15.15 dated February 26, 2020, the Board of Trustees authorized the award of Contract 2020-0628 for Architectural and Engineering Services to Fuller & D’Angelo Architects for $1 million and a term of three years, and

WHEREAS: By Resolution 15.3 dated March 16, 2022 the Board of Education authorized amendment to increase contract amount to $2 million and the term to four years, and

WHEREAS: Work as described in contract 2020-0628 is required of Fuller and D’Angelo Architects in response to the issuance of the Emergency Declaration for “School 16 Flooding” dated August 11, 2022, and

WHEREAS: The response by Fuller & D’Angelo P.C., (F&D) was deemed most advantageous to the District at a cost not to exceed $9,300.00.

NOW THEREFORE BE IT RESOLVED: That the Superintendent of Schools is hereby authorized to assign the architectural work for CIP 10952, “Emergency Flood Remediation” at School 16 to Fuller and D’Angelo P.C. Architects and Planners, Road 45 Knollwood Road, Elmsford, New York 10523 for $9,300 for a term of 365 calendar days.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 7 Nay: 0.
The motion Carried 7 - 0
   
Lawrence Sykes     Yes
Rosemarie Linton     Yes
Amjed Kuri     Yes
Sheila Greenwald     Yes
Gail Burns     Yes
Dr. Rosalba Corrado Del Vecchio     Yes
Rev. Steve Lopez     Yes